Basre(IRAQ) Drinking Water Tratment Plant

 

Alrevad Aldiar and Alghode Alsharif as the employer notified this project to our company on 2013. The contract period is 5 months. The site of this project is in Basreh. The capacity of this water treatment is 4500m3/hr.

The services which are done by abangan Sanat co. are Doing  all the design and engineering including: basic design, detail design and Preparation executive drawing, purchasing engineer for mechanical, process, ELECTRICITY, instrument and control equipments .

In this project, raw water of Shatoalarab river is pumped to treatment plant by cast iron pipeline. Raw water After Measuring the flow rate , enters to rapid mixing tanks. In this tanks raw water is mixed with a solution of alum as a coagulant and enters to baffled Floculator tanks. Water is directed to 4 sedimentation tanks for separating of flocs and then clear water transferred to rapid gravity filters. Water from backwashing the filter enters to recovery tank and then is returned to beginning of the water treatment plant. Filtered water is transferred to storage tanks after chlorination. Finally it is pumped to the water network of Basra by split pumps.

 


برای نمایش تصاویر گالری كلیك كنیدبرای نمایش تصاویر گالری كلیك كنید